Building the main hull for the Scarab 32

Back to Scarab 32 Prototype

main hull

MDF temporary bulkheads slotted onto MDF longitudinals.

main hull

Both longitudinals had a steel channel member attached to ensure straightness.

main hull

Bottom panel on first.

main hull

main hull

main hull

main hull

Ready for final alignment and bogging.

main hull

main hull

Grinding where the tape will attach.

main hull

Taped and peel ply added.

main hull

main hull

Scarab 32

Scarab 32

Hull was filled with Q-cells.

Scarab 32

Sanded and primed with Jotun penguard leaving an area to be painted with copper expoxy anti-foul.

Scarab 32

Scarab 32

A quick peak underneath before turning the hull.

Scarab 32

Scarab 32

Scarab 32

Scarab 32

Scarab 32

Scarab 32

Temporary braces to aid with turning the hull.

Main hull

Main hull

Main hull

Main hull

Scarab 32

Scarab 32

Scarab 32

Scarab 32

Scarab 32

Main hull

Scarab 32

Scarab 32

Scarab 32

Scarab 32

Scarab 32

Scarab 32

Scarab 32

Scarab 32